47th Street 3 Lane Design Feasibility Study
In May 2010, the Village contracted with the engineering firm, Kenig, Lindgren, O'Hara, Aboona, Inc. (KLOA) to perform a preliminary traffic engineering study to determine the feasibility of reducing the cross section of 47th Street from four lanes to three. The purpose of the study was to assess the existing traffic operations on 47th Street, determine if a three lane cross section is appropriate, and make preliminary recommendations for improvements.
View a copy of the 47th Street Design Feasibility Study (PDF).